Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms in the house and they are generally also the most expensive for renovate. Bathroom renovation can be a job that, if done well, may add value to some home as well as a great space full of design and light-weight.
Bhavana Interior  Best Interior Designers  Decorators in Bangalore, India, Exterior Designing

Bathroom design
Bathroom design will be the first part of a bath room renovation you should get right. Just replacing the present bathroom with similar design might not be enough. The key to great bathroom design is usually to design it using the folks that are likely to put it to use in your mind. However make certain that a bath room design also has an over-all use factor at the same time.

For example: If you were designing your bathrooms for families you could still design the bathroom with quick access to the shower and bath. This would make sure that the design would recieve treatment if you have limited mobility. This means if you sell your property or if you're renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, considering the light or window space, height and width of fittings, and drainage options. Draw out an agenda to scale and all the way down the sizes of your respective room. Mark the prevailing drainage points and after that and water inlet points. Write down a wish list of the lavatory fittings to require and desire using their sizes. Now marry both together and see what fits. Note: Most bathroom drainage and water inlet points may be moved but this does come at extra expense.
House 3D Interior Exterior Design Rendering  Modern Home Designs

Bathroom remodel
If you decide to do the work yourself or part of the project it is time to employ a skip bin and pull out the old bathroom. If your home was made pre 1980 you might have fibro bathroom wall linings with asbestos inside it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing set up you won't ought to turn the river off for your house. Also you will need to jack hammer the floor tiles up as well as the sand and cement bed that they are laid on.
Foto: Villa Prefabbricata In Legno di Dbiostudio 66513  Habitissimo

Bathroom Renovation and construction
Bathrooms should be construction properly from your start to make sure that the finished job is correct and true. This also ensures the look and search of the lavatory will have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct nov the floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Villa Interiors in Bangalore find here best Villa Interior design


Paint ceiling and final  one - Plumbing and electrical
At now brand new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the new plumbing in order that the plumbing fittings are correct if the tiling is fully gone. For example: To centre a fitting in a very shower recess you need to consider the thickness from the wall board, tile glue and tile and so the fitting will be centred following your tiles are in position. The same refers to installing drainage pipes for the toilet; the wall lining and tile thickness have to be taken into account so the pipe influences correct position in the event the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them for the mains power.
Exterior House Designers In Bangalore – Livinspace

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on your new wall board with a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you happen to be laying your tiles from floor to ceiling don't install the cornice because best done after tiling. If you're not tiling to the ceiling go ahead and install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath isn't freestanding it's simple to from the frame and install the bathtub. Ensure the tub is installed correctly permitting the thickness from the tiles and  sure to check on all linings and pipes prior to deciding to continue with your bathroom renovation.

House 3D Interior Exterior Design Rendering Modern Home Designs
Bhavana Interior  Best Interior Designers  Decorators in Bangalore, India, Exterior Designing

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing a floor ensure that the waterproofing comes 100mm up the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the bath ought to be waterproofed 100mm above the lip from the bath right around and to the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water will still only drop a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most important.
Step four - Lay within the cement screed for a floor.

Before a floor tiles can laid the bottom must be smooth and fairly flat which has a slight fall on the drainage outlet. To do this you need to use sand and cement mix and it's also better to add a waterproofing agent into this as well. With a level, set the ground level at the doorway. Use the top aluminum angle since the finished floor level and measure down the thickness with the tile plus 10mm for your glue. Mark right around the toilet with a level after which screed in your sand and cement mix having a 1 to 3 degree fall for the top with the drain outlet. Take your time and acquire it right with all the finished level as smooth as is possible. When the sand cement mix has set but is not dry (you'll be able to walk on it nevertheless, you will still be a bit soft) rub it over with a house brick. This will remove each of the small highs and lows and check having a level as you go. Let the restroom floor fully dry and then you really should have an incredible surface to tile onto. Tip: the greater work you add into the bottom screed the more your tiling will likely be.
Foto: Villa Prefabbricata In Legno di Dbiostudio 66513 Habitissimo
House 3D Interior Exterior Design Rendering  Modern Home Designs

Step five: Tile floor and walls
Lay your tiles on a floor first after which grout. Then lay your wall tiles ensuring that they are level because you lay. Once the restroom tiles are actually cut and laid, grout all of your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity ensuring it can be level and sealed throughout the top with silicone as well as seal around the bathtub. Tip: make sure they are in the right place before you decide to drill to your tiles.
Villa Interiors in Bangalore find here best Villa Interior design
Foto: Villa Prefabbricata In Legno di Dbiostudio 66513  Habitissimo

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring things are all fitted correctly and that there won't be any leaks with your plumbing. - Enjoy your brand-new bathroom.

Comments