Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms at home plus they are also the most expensive for renovate. Bathroom renovation is often a job that, if done well, can add value to a home plus a great space full of design and lightweight.
Bedroom Interior in C I D  Chennai Interior Decors

Bathroom design
Bathroom design will be the first division of your bathrooms renovation you need to get right. Just replacing the existing bathroom with the same design will not be enough. The key to great bathroom design is usually to design it with the individuals who are likely to utilize it at heart. However make sure that a bath room design boasts an overall use factor at the same time.

For example: If you were designing your bathrooms for families you can still design the bathroom with easy access towards the shower and bath. This would ensure that the look would also work if you have limited mobility. This means if you opt to sell your property or if you might be renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, taking into account the light or window space, size of fittings, and drainage options. Draw out a strategy to scale and down the sizes of your room. Mark the current drainage points and after that and water inlet points. Write down a wish list of the restroom fittings to require and need with their sizes. Now marry the 2 together and see what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at extra cost.
50 Best Bedroom Interior Design 2018  Bedroom

Bathroom remodel
If you've decided to accomplish the work yourself or part of the task it's time to work with a skip bin and grab the previous bathroom. If your own home was made pre 1980 you might have fibro bathroom wall linings with asbestos inside it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing set up you'll not need to turn the lake off for the whole house. Also you should jack hammer a floor tiles up and also the sand and cement bed that they are laid on.
Bedroom Ideas: 52 Modern Design Ideas for your Bedroom  The LuxPad

Bathroom Renovation and construction
Bathrooms has to be construction properly through the start to make certain that the finished job is correct and true. This also ensures the design and search of the lavatory may have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the tub hob and bath.

Waterproof the ground and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Image Gallary 1: Best Bedroom Interior Design 2011


Paint ceiling and final  one - Plumbing and electrical
At this point all new plumbing is installed for clean cold and hot water and drainage. Careful attention needs to be taken when positioning the new plumbing so your plumbing fittings are correct when the tiling is finished. For example: To centre a fitting in the shower recess you need to take into consideration the thickness with the wall board, tile glue and tile hence the fitting will be centred as soon as the tiles are set up. The same applies to installing drainage pipes for the toilet; the wall lining and tile thickness should be considered so the pipe influences correct position when the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them to the mains power.
best interior design master bedroom  YouTube

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board which has a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you're laying your tiles from floor to ceiling do not install the cornice because most effectively achieved after tiling. If you happen to be not tiling on the ceiling just install the cornice as soon as the wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding now you can form the frame and install the bath. Ensure the bathtub is installed correctly enabling the thickness from the tiles and  sure to check on all linings and pipes before you continue with your bathroom renovation.

50 Best Bedroom Interior Design 2018 Bedroom
Bedroom Interior in C I D  Chennai Interior Decors

Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the ground be sure that the waterproofing comes 100mm inside the walls. The shower recess must be waterproofed 100mm over the shower rose outlet. Also the bathtub needs to be waterproofed 100mm higher than the lip in the bath around and for the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water will only go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most important.
Step four - Lay inside cement screed for the bottom.

Before the floor tiles can laid a floor must be smooth and fairly flat which has a slight fall on the drainage outlet. To do this you have to use sand and cement mix and it is advisable to include a waterproofing agent into this also. With a level, set the ground level on the doorway. Use the top aluminum angle as the finished floor level and measure down the thickness in the tile plus 10mm for your glue. Mark around the restroom which has a level after which screed in your sand and cement mix with a 1 to 3 degree fall for the top with the drain outlet. Take your time and get it right while using finished level as smooth as you can. When the sand cement mix has set but isn't dry (you are able to walk onto it however you will still be a lttle bit soft) rub it over having a house brick. This will remove each of the small highs and lows and look having a level while you go. Let the toilet floor fully dry and then you should have an excellent surface to tile onto. Tip: the more work you put into the bottom screed the easier your tiling will be.
Bedroom Ideas: 52 Modern Design Ideas for your Bedroom The LuxPad
50 Best Bedroom Interior Design 2018  Bedroom

Step five: Tile floor and walls
Lay your tiles on the ground first after which grout. Then lay your wall tiles making certain actually level while you lay. Once the restroom tiles have been cut and laid, grout your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit a new bathroom vanity ensuring it's level and sealed round the top with silicone and also seal around the bath. Tip: make sure they have been in the right place before you decide to drill in your tiles.
Image Gallary 1: Best Bedroom Interior Design 2011
Bedroom Ideas: 52 Modern Design Ideas for your Bedroom  The LuxPad

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring things are all fitted correctly and that there won't be any leaks inside your plumbing. - Enjoy a new bathroom.