Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home and they are generally also one the most expensive to renovate. Bathroom renovation is really a job that, if done well, will add value with a home as well as a great space full of design and lightweight.
Backyard Swimming Pool Design Foruum Co Landscaping Homesthetics ~ Clipgoo

Bathroom design
Bathroom design could be the first division of your bathrooms renovation you should get right. Just replacing the current bathroom with similar design might not be enough. The key to great bathroom design is always to design it with all the individuals who are going to apply it planned. However make sure that your bathrooms design even offers a general use factor also.

For example: If you were designing your bathroom for families you may still design the toilet with easy accessibility to the shower and bath. This would make sure that the structure would work for people with limited mobility. This means if you choose to sell your house or if you happen to be renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, taking into account the lighting or window space, sized fittings, and drainage options. Draw out an agenda to scale and all the way down the sizes of your room. Mark the present drainage points after which and water inlet points. Write down a wish listing of the toilet fittings to want and need using their sizes. Now marry both together and see what fits. Note: Most bathroom drainage and water inlet points may be moved but this may come at expense.
Swim Up Bar Pool  YouTube

Bathroom remodel
If you decide to perform the project yourself or part of the task it really is time to work with a skip bin and take out that old bathroom. If your home was made pre 1980 you could have fibro bathroom wall linings with asbestos inside it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing set up you'll not must turn water off for the whole house. Also you will need to jack hammer a floor tiles up and the sand and cement bed they are laid on.
30 Beautiful House Pool Design Ideas  YouTube

Bathroom Renovation and construction
Bathrooms must be construction properly from the ground-up to make sure that the finished job is correct and true. This also ensures the design and appearance of the toilet will have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof the ground and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Backyard Landscaping IdeasSwimming Pool Design  Homesthetics  Inspiring ideas for your home.


Paint ceiling and final  one - Plumbing and electrical
At this aspect new plumbing is installed for clean hot and cold water and drainage. Careful attention must be taken when positioning the brand new plumbing so the plumbing fittings are correct if the tiling is fully gone. For example: To centre a fitting in a very shower recess you have to take into consideration the thickness of the wall board, tile glue and tile so the fitting will be centred following your tiles are set up. The same pertains to installing drainage pipes for any toilet; the wall lining and tile thickness have to be taken into consideration therefore the pipe influences correct position when the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them to the mains power.
Backyard Landscaping IdeasSwimming Pool Design  Homesthetics  Inspiring ideas for your home.

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on to your new wall board with a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because this is done after tiling. If you are not tiling on the ceiling go ahead and install the cornice after the wallboard and ceiling lining happen to be installed. Also if your bath isn't freestanding it's simple to form the frame and install the bathtub. Ensure the bathtub is installed correctly enabling the thickness with the tiles and  sure to test all linings and pipes before you decide to continue with a bath room renovation.

Swim Up Bar Pool YouTube
Backyard Swimming Pool Design Foruum Co Landscaping Homesthetics ~ Clipgoo

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the ground make sure that the waterproofing comes 100mm inside the walls. The shower recess will need to be waterproofed 100mm across the shower rose outlet. Also the bathtub ought to be waterproofed 100mm higher than the lip from the bath right around and on the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, and so the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most crucial.
Step four - Lay within the cement screed for the bottom.

Before the ground tiles can laid a floor should be smooth and fairly flat which has a slight fall on the drainage outlet. To do this you must use sand and cement mix and it is far better to give a waterproofing agent into this at the same time. With a level, set the ground level in the doorway. Use the top aluminum angle since the finished floor level and measure on the thickness in the tile plus 10mm for the glue. Mark right around the bathroom with a level then screed in your sand and cement mix having a 1 to 3 degree fall to the top of the drain outlet. Take your time and get it right using the finished level as smooth as is possible. When the sand cement mix has set but isn't dry (you are able to walk into it nevertheless, you will still be a bit soft) rub it over having a house brick. This will remove all the small highs and lows and look which has a level while you go. Let the bathroom floor fully dry after which you must have an incredible surface to tile onto. Tip: the greater work you place into a floor screed the easier your tiling will likely be.
30 Beautiful House Pool Design Ideas YouTube
Swim Up Bar Pool  YouTube

Step five: Tile floor and walls
Lay your tiles on the ground first after which grout. Then lay your wall tiles ensuring that that they're level because you lay. Once the restroom tiles have been cut and laid, grout your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your bathroom vanity making certain it can be level and sealed around the top with silicone and also seal around the bathtub. Tip: make sure they will be in the right place before you decide to drill into your tiles.
Backyard Landscaping IdeasSwimming Pool Design Homesthetics Inspiring ideas for your home.
30 Beautiful House Pool Design Ideas  YouTube

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making sure things are all fitted correctly and that there isn't any leaks within your plumbing. - Enjoy your new bathroom.