55 Best Modern House Plan / Ideas For 2018

Window For Home Design 2 Window Home Design Home Window Designs Home Design Ideas Awesome 55 Best Modern House Plan / Ideas For 2018

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the home plus they are also one the most expensive for renovate. Bathroom renovation is really a job that, if done well, will add value to some home along with a great space full of design and light-weight.
55 Best Modern House Plan / Ideas For 2018

Bathroom design
Bathroom design may be the first area of your bathroom renovation you ought to get right. Just replacing the existing bathroom sticking with the same design will not be enough. The key to great bathroom design is to design it with all the people that will put it to use at heart. However be sure that your bathrooms design also offers a general use factor also.

For example: If you were designing a bath room for families you might still design the restroom with quick access to the shower and bath. This would make certain that the look would also work for people with limited mobility. This means if you opt to sell your home or if you happen to be renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, taking into account the sunshine or window space, sized fittings, and drainage options. Draw out a plan to scale and down the sizes of your respective room. Mark the present drainage points and after that and water inlet points. Write down a wish set of the restroom fittings to need and desire making use of their sizes. Now marry both together and see what fits. Note: Most bathroom drainage and water inlet points can be moved but this does come at extra expense.
Window Grill Design Pvc/aluminum Windows Design For Philippines Modern Iron Window Grill Design

Bathroom remodel
If you decide to do the task yourself or part of the job it can be time to engage a skip bin and grab the previous bathroom. If your home was developed pre 1980 you may have fibro bathroom wall linings with asbestos within it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in place you'll not need to turn the lake off for the entire house. Also you should jack hammer the ground tiles up as well as the sand and cement bed that they're laid on.
جنا لبنان للحدادة والألمنيوم والديكور

Bathroom Renovation and construction
Bathrooms has to be construction properly from the start to make certain that the finished job is correct and true. This also ensures the look and appear of the restroom may have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof the ground and shower and bath recess.

Correct nov the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Stylish Window Grill Designs 3 Photoage Net Design ~ Clipgoo


Paint ceiling and final  one - Plumbing and electrical
At this time brand new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the brand new plumbing so the plumbing fittings are correct if the tiling is completed. For example: To centre a fitting in a shower recess you should take into account the thickness in the wall board, tile glue and tile hence the fitting will be centred following the tiles are set up. The same refers to installing drainage pipes for a toilet; the wall lining and tile thickness should be taken into account hence the pipe influences correct position in the event the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them to the mains power.
Stainless Steel Window Grill  Window grill design in 2019  Window grill design, Grill design

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on to your new wall board which has a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice as this is most effectively achieved after tiling. If you're not tiling towards the ceiling proceed to install the cornice as soon as the wallboard and ceiling lining happen to be installed. Also if your bath is just not freestanding you can now from the frame and install the bath. Ensure the tub is installed correctly enabling the thickness from the tiles and  sure to check all linings and pipes before you decide to continue with a bath room renovation.

Window Grill Design Pvc/aluminum Windows Design For Philippines Modern Iron Window Grill Design
55 Best Modern House Plan / Ideas For 2018

Step three - Waterproof your bathrooms
Waterproof your bathrooms floor, shower recess, and around the bathtub. When waterproofing a floor ensure that the waterproofing comes 100mm inside the walls. The shower recess must be waterproofed 100mm higher than the shower rose outlet. Also the bath should be waterproofed 100mm above the lip in the bath around and towards the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most significant.
Step four - Lay inside the cement screed for the floor.

Before the floor tiles can laid the bottom should be smooth and fairly flat using a slight fall for the drainage outlet. To do this you must use sand and cement mix and it is better to add a waterproofing agent into this also. With a level, set the bottom level at the doorway. Use the top aluminum angle since the finished floor level and measure on the thickness in the tile plus 10mm for that glue. Mark around the toilet which has a level after which screed with your sand and cement mix which has a 1 to 3 degree fall towards the top with the drain outlet. Take your time and get it right with the finished level as smooth as possible. When the sand cement mix has set but is not dry (you are able to walk about it however, you it is a bit soft) rub it over having a house brick. This will remove every one of the small highs and lows and appearance with a level because you go. Let the restroom floor fully dry and after that you should have an excellent surface to tile onto. Tip: the greater work you set into the ground screed the easier your tiling will be.
جنا لبنان للحدادة والألمنيوم والديكور
Window Grill Design Pvc/aluminum Windows Design For Philippines Modern Iron Window Grill Design

Step five: Tile floor and walls
Lay your tiles on the floor first then grout. Then lay your wall tiles making sure actually level while you lay. Once the restroom tiles have been cut and laid, grout your entire tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit a new bathroom vanity ensuring it's level and sealed around the top with silicone and also seal around the tub. Tip: make sure they are in the right place before you drill in your tiles.
Stylish Window Grill Designs 3 Photoage Net Design ~ Clipgoo
جنا لبنان للحدادة والألمنيوم والديكور

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making certain things are fitted correctly which there aren't any leaks with your plumbing. - Enjoy your brand-new bathroom.

Comments