5 Chandeliers For 5 Different Styles

Modern Pendant Lighting For Dining Room Contemporary Pendant Lighting For Dining Room Of Nifty Contemporary 5 Chandeliers For 5 Different Styles

Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms at home and they're also one the most expensive for renovate. Bathroom renovation is often a job that, if done well, will add value to a home plus a great space brimming with design and lightweight.
5 Chandeliers For 5 Different Styles

Bathroom design
Bathroom design may be the first area of a bath room renovation you should get right. Just replacing the prevailing bathroom with similar design may not be enough. The key to great bathroom design would be to design it using the people that will certainly use it planned. However be sure that your bathroom design boasts a general use factor as well.

For example: If you were designing a bathroom for families you can still design the bathroom with comfortable access on the shower and bath. This would ensure that the style would work for people with limited mobility. This means if you choose to sell your property or if you might be renovating for profit your design has a wider market appeal. Great bathroom design also uses the space well, considering the light or window space, sized fittings, and drainage options. Draw out a plan to scale and right down the sizes of the room. Mark the prevailing drainage points and then and water inlet points. Write down a wish set of the bathroom fittings to want and want using sizes. Now marry both together and find out what fits. Note: Most bathroom drainage and water inlet points can be moved but this certainly does come at extra expense.
Modern/ Contemporary Bedroom Dining Room Wood Drum Pendant Light with Fabric Shade  LightingO.co.uk

Bathroom remodel
If you've decided to do the work yourself or part of the project it's time to work with a skip bin and pull out that old bathroom. If your home appeared pre 1980 you may have fibro bathroom wall linings with asbestos within it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing set up you do not have to turn the river off for the entire house. Also you will need to jack hammer the bottom tiles up as well as the sand and cement bed they are laid on.
Beautiful Dining Room pendants  A Change of Space

Bathroom Renovation and construction
Bathrooms must be construction properly through the start to ensure that the finished job is correct and true. This also ensures the style and appear of the lavatory can have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof the ground and shower and bath recess.

Correct the fall of the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Drops Chandelier  Contemporary  Dining Room  Los Angeles  by Light In Art


Paint ceiling and final  one - Plumbing and electrical
At this aspect many new plumbing is installed for clean hot and cold water and drainage. Careful attention needs to be taken when positioning the modern plumbing so that the plumbing fittings are correct once the tiling is fully gone. For example: To centre a fitting in a very shower recess you have to take into account the thickness from the wall board, tile glue and tile hence the fitting will probably be centred after the tiles are set up. The same applies to installing drainage pipes to get a toilet; the wall lining and tile thickness must be taken into consideration hence the pipe is within the correct position when the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them for the mains power.
Corbett Lighting

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on your new wall board using a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling don't install the cornice because this is best done after tiling. If you are not tiling towards the ceiling go ahead and install the cornice as soon as the wallboard and ceiling lining are actually installed. Also if your bath isn't freestanding anyone can make up the frame and install the tub. Ensure the tub is installed correctly allowing for the thickness of the tiles and  sure to check on all linings and pipes before you decide to continue with a bath room renovation.

Modern/ Contemporary Bedroom Dining Room Wood Drum Pendant Light with Fabric Shade LightingO.co.uk
5 Chandeliers For 5 Different Styles

Step three - Waterproof your bathrooms
Waterproof your bathrooms floor, shower recess, and around the bath. When waterproofing a floor make certain that the waterproofing comes 100mm up the walls. The shower recess should be waterproofed 100mm across the shower rose outlet. Also the tub ought to be waterproofed 100mm above the lip with the bath right around and towards the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water is only going to drop a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most significant.
Step four - Lay inside the cement screed for the ground.

Before a floor tiles can laid the bottom has to be smooth and fairly flat using a slight fall on the drainage outlet. To do this you should use sand and cement mix and it's also advisable to give a waterproofing agent into this as well. With a level, set a floor level in the doorway. Use the top aluminum angle since the finished floor level and measure down the thickness in the tile plus 10mm to the glue. Mark right around the bathroom with a level after which screed in your sand and cement mix using a 1 to 3 degree fall to the top in the drain outlet. Take your time and have it right with all the finished level as smooth as you possibly can. When the sand cement mix has set but just isn't dry (you'll be able to walk about it however you it's still a bit soft) rub it over having a house brick. This will remove every one of the small highs and lows and appearance using a level while you go. Let the lavatory floor fully dry and after that you must have an excellent surface to tile onto. Tip: the harder work you set into the bottom screed the simpler your tiling is going to be.
Beautiful Dining Room pendants A Change of Space
Modern/ Contemporary Bedroom Dining Room Wood Drum Pendant Light with Fabric Shade  LightingO.co.uk

Step five: Tile floor and walls
Lay your tiles on the bottom first then grout. Then lay your wall tiles ensuring actually level because you lay. Once the lavatory tiles have been cut and laid, grout your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your bathroom vanity ensuring it really is level and sealed across the top with silicone and also seal around the bathtub. Tip: make sure they will be in the right place before you drill in your tiles.
Drops Chandelier Contemporary Dining Room Los Angeles by Light In Art
Beautiful Dining Room pendants  A Change of Space

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean making certain things are fitted correctly which there aren't any leaks within your plumbing. - Enjoy your brand-new bathroom.

Comments