Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house and they're also the most expensive to renovate. Bathroom renovation is a job that, if done well, may add value to a home as well as a great space brimming with design and light.
4 Bedrooms BungalowBg025

Bathroom design
Bathroom design will be the first division of your bathrooms renovation you ought to get right. Just replacing the current bathroom with similar design might not be enough. The key to great bathroom design is usually to design it while using individuals who are going to utilize it in your mind. However make certain that a bath room design also offers a general use factor too.

For example: If you were designing your bathrooms for families you may still design the toilet with comfortable access towards the shower and bath. This would ensure that the style would recieve treatment if you have limited mobility. This means if you opt to sell your house or if you might be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the room well, taking into consideration the light or window space, size fittings, and drainage options. Draw out a strategy to scale and right down the sizes of the room. Mark the current drainage points and after that and water inlet points. Write down a wish list of the lavatory fittings to wish and need using sizes. Now marry both the together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at extra cost.
3D Bungalow House Plans 4Bedroom 4 Bedroom Bungalow Floor Plan, 4 bedroom bungalow plans

Bathroom remodel
If you decide to complete the project yourself or part of the work it is time to employ a skip bin and pull out the existing bathroom. If your property was developed pre 1980 you could have fibro bathroom wall linings with asbestos within it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in place you do not must turn water off for your house. Also you should jack hammer the ground tiles up and also the sand and cement bed actually laid on.
3 Bedroom Bungalow House Plans In the Philippines Best Of Free Lay Out and Estimate Philippine

Bathroom Renovation and construction
Bathrooms have to be construction properly through the start to be sure that the finished job is correct and true. This also ensures the design and look of the bathroom will have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bath hob and bath.

Waterproof the floor and shower and bath recess.

Correct the fall of the floor with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Sophie Mbeyu Blog: NYUMBA ZA KISASA!


Paint ceiling and final  one - Plumbing and electrical
At this time all new plumbing is installed for clean cold and warm water and drainage. Careful attention must be taken when positioning the new plumbing so the plumbing fittings are correct if the tiling is completed. For example: To centre a fitting inside a shower recess you have to consider the thickness of the wall board, tile glue and tile so the fitting will likely be centred after the tiles are set up. The same applies to installing drainage pipes to get a toilet; the wall lining and tile thickness has to be taken into account so the pipe is within the correct position if the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them on the mains power.
2 Single Floor Houses 1450 Sq Ft In 9 6 Cents And 1650 Three Bedroom Bungalow Design 3d

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board with a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because done after tiling. If you happen to be not tiling towards the ceiling go on and install the cornice as soon as the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding you can now make up the frame and install the tub. Ensure the bathtub is installed correctly enabling the thickness from the tiles and  sure to check on all linings and pipes when you continue with your bathroom renovation.

3D Bungalow House Plans 4Bedroom 4 Bedroom Bungalow Floor Plan, 4 bedroom bungalow plans
4 Bedrooms BungalowBg025

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the bottom make certain that the waterproofing comes 100mm the walls. The shower recess will need to be waterproofed 100mm across the shower rose outlet. Also the tub must be waterproofed 100mm above the lip of the bath about and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water is only going to go down a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most critical.
Step four - Lay within the cement screed for the bottom.

Before the bottom tiles can laid a floor should be smooth and fairly flat having a slight fall on the drainage outlet. To do this you need to use sand and cement mix and it's also far better to put in a waterproofing agent into this too. With a level, set the ground level with the doorway. Use the top aluminum angle because finished floor level and measure along the thickness of the tile plus 10mm for that glue. Mark around the bathroom using a level and then screed inside your sand and cement mix which has a 1 to 3 degree fall on the top with the drain outlet. Take your time and have it right using the finished level as smooth as possible. When the sand cement mix has set but is not dry (you can walk about it but you will still be a bit soft) rub it over with a house brick. This will remove all the small highs and lows and check which has a level while you go. Let the toilet floor fully dry after which you should have an excellent surface to tile onto. Tip: greater work you add into the floor screed the simpler your tiling will probably be.
3 Bedroom Bungalow House Plans In the Philippines Best Of Free Lay Out and Estimate Philippine
3D Bungalow House Plans 4Bedroom 4 Bedroom Bungalow Floor Plan, 4 bedroom bungalow plans

Step five: Tile floor and walls
Lay your tiles on the floor first and then grout. Then lay your wall tiles ensuring that they are level because you lay. Once the restroom tiles happen to be cut and laid, grout your entire tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit a new bathroom vanity making certain it really is level and sealed across the top with silicone plus seal around the bath. Tip: make sure they will be in the right place before you drill to your tiles.
Sophie Mbeyu Blog: NYUMBA ZA KISASA!
3 Bedroom Bungalow House Plans In the Philippines Best Of Free Lay Out and Estimate Philippine

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring things are all fitted correctly understanding that there are no leaks within your plumbing. - Enjoy a new bathroom.