39 Dream Barn Kitchen Designs DigsDigs

Kitchens Styles And Designs 50 Best Kitchen Styles Dream Kitchen Ideas 39 Dream Barn Kitchen Designs DigsDigs

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms at home and they are also certainly the most expensive for renovate. Bathroom renovation is often a job that, if done well, will add value to your home as well as a great space full of design and lightweight.
39 Dream Barn Kitchen Designs  DigsDigs

Bathroom design
Bathroom design may be the first area of your bathroom renovation you should get right. Just replacing the prevailing bathroom with similar design might not be enough. The key to great bathroom design is usually to design it using the folks that will utilize it in mind. However be sure that your bathroom design also offers an overall use factor as well.

For example: If you were designing a bath room for families you could still design the restroom with quick access for the shower and bath. This would be sure that the style would recieve treatment for people with limited mobility. This means if you choose to sell your property or if you are renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, taking into account the sunshine or window space, height and width of fittings, and drainage options. Draw out an agenda to scale and right down the sizes of the room. Mark the existing drainage points then and water inlet points. Write down a wish listing of the lavatory fittings to require and need with their sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points might be moved but this does come at extra expense.
50 Best Kitchen Styles  Dream Kitchen Ideas

Bathroom remodel
If you've decided to do the task yourself or part of the job it's time to work with a skip bin and retrieve the old bathroom. If your home was developed pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing set up you'll not must turn the lake off for the complete house. Also you should jack hammer the ground tiles up as well as the sand and cement bed that they're laid on.
50 Best Kitchen Styles  Dream Kitchen Ideas

Bathroom Renovation and construction
Bathrooms has to be construction properly through the ground-up to make certain that the finished job is correct and true. This also ensures the style and appear of the toilet may have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct december the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Best 25+ Country kitchen designs ideas on Pinterest  Country kitchen, French country kitchens


Paint ceiling and final  one - Plumbing and electrical
At this time all new plumbing is installed for clean cold and hot water and drainage. Careful attention has to be taken when positioning the new plumbing so the plumbing fittings are correct in the event the tiling is finished. For example: To centre a fitting in a shower recess you must take into consideration the thickness from the wall board, tile glue and tile so the fitting will be centred after the tiles are in place. The same applies to installing drainage pipes to get a toilet; the wall lining and tile thickness should be taken into consideration so the pipe is incorporated in the correct position if the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them for the mains power.
HGTV Dream Home 2019: Kitchen Pictures  HGTV Dream Home 2019  HGTV

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on to your new wall board having a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling do not install the cornice as this is most effectively achieved after tiling. If you're not tiling for the ceiling just install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath isn't freestanding you can now from the frame and install the bathtub. Ensure the bath is installed correctly allowing for the thickness from the tiles and  sure to test all linings and pipes before you continue with a bath room renovation.

50 Best Kitchen Styles Dream Kitchen Ideas
39 Dream Barn Kitchen Designs  DigsDigs

Step three - Waterproof your bathroom
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the floor make sure that the waterproofing comes 100mm in the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the tub ought to be waterproofed 100mm over the lip with the bath around and for the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, hence the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most critical.
Step four - Lay inside the cement screed for the bottom.

Before the ground tiles can laid the bottom has to be smooth and fairly flat using a slight fall on the drainage outlet. To do this you need to use sand and cement mix in fact it is best to give a waterproofing agent into this too. With a level, set a floor level at the doorway. Use the top aluminum angle because the finished floor level and measure on the thickness of the tile plus 10mm for the glue. Mark around the bathroom using a level then screed inside your sand and cement mix with a 1 to 3 degree fall on the top in the drain outlet. Take your time and get it right using the finished level as smooth as you possibly can. When the sand cement mix has set but is just not dry (you can walk into it nevertheless, you will still be a lttle bit soft) rub it over which has a house brick. This will remove all the small highs and lows and look using a level as you go. Let the lavatory floor fully dry and then you needs to have a great surface to tile onto. Tip: the more work you place into a floor screed the easier your tiling is going to be.
50 Best Kitchen Styles Dream Kitchen Ideas
50 Best Kitchen Styles  Dream Kitchen Ideas

Step five: Tile floor and walls
Lay your tiles on the floor first after which grout. Then lay your wall tiles making sure actually level when you lay. Once the bathroom tiles are already cut and laid, grout all your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your new bathroom vanity ensuring it is level and sealed around the top with silicone and also seal around the bath. Tip: make sure they have been in the right place prior to deciding to drill to your tiles.
Best 25+ Country kitchen designs ideas on Pinterest Country kitchen, French country kitchens
50 Best Kitchen Styles  Dream Kitchen Ideas

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making certain it is all totally fitted correctly which there won't be any leaks in your plumbing. - Enjoy your bathroom.

Comments