Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house and they are also one the most expensive for renovate. Bathroom renovation is really a job that, if done well, can add value to some home plus a great space brimming with design and light-weight.
37 Walk In Showers That Add A Touch of Class and Boost Aesthetics  Decoholic

Bathroom design
Bathroom design may be the first area of your bathroom renovation you need right. Just replacing the present bathroom with the exact same design may not be enough. The key to great bathroom design would be to design it with all the individuals who are likely to utilize it planned. However ensure that a bath room design also offers a broad use factor at the same time.

For example: If you were designing a bathroom for families you may still design the bathroom with easy accessibility on the shower and bath. This would ensure that the style would also work if you have limited mobility. This means if you sell your home or if you're renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, looking at the light or window space, size of fittings, and drainage options. Draw out an agenda to scale and right down the sizes of the room. Mark the current drainage points and then and water inlet points. Write down a wish report on the bathroom fittings to want and desire using sizes. Now marry both together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this may come at extra cost.
100 Small Bathroom Designs  Ideas  Hative

Bathroom remodel
If you decide to complete the task yourself or part of the project it's time to hire a skip bin and retrieve the existing bathroom. If your own home was made pre 1980 maybe you have fibro bathroom wall linings with asbestos inside and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing available you won't need to turn the river off for the complete house. Also you will likely need to jack hammer the floor tiles up as well as the sand and cement bed they are laid on.
NoDoor Walk in Shower Ideas and Facts You Must Know  Traba Homes

Bathroom Renovation and construction
Bathrooms must be construction properly from your ground up to be sure that the finished job is correct and true. This also ensures the structure and look of the lavatory could have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct december the floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
The domain name snoofo.com is for sale in 2019  bathrooms  Bathroom design small, Small


Paint ceiling and final  one - Plumbing and electrical
At now new plumbing is installed for clean hot and cold water and drainage. Careful attention should be taken when positioning the brand new plumbing so your plumbing fittings are correct when the tiling ends. For example: To centre a fitting in a shower recess you need to take into consideration the thickness of the wall board, tile glue and tile therefore the fitting will be centred as soon as the tiles are in position. The same applies to installing drainage pipes for the toilet; the wall lining and tile thickness has to be taken into consideration so the pipe is incorporated in the correct position when the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them to the mains power.
Efficient Use Of Your Attic: 18 Sleek Attic Bathroom Design Ideas

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on to your new wall board which has a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling tend not to install the cornice because done after tiling. If you're not tiling on the ceiling go on and install the cornice as soon as the wallboard and ceiling lining happen to be installed. Also if your bath just isn't freestanding anyone can from the frame and install the bath. Ensure the bath is installed correctly allowing for the thickness from the tiles and  sure to check on all linings and pipes when you continue with your bathrooms renovation.

100 Small Bathroom Designs Ideas Hative
37 Walk In Showers That Add A Touch of Class and Boost Aesthetics  Decoholic

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the floor make sure that the waterproofing comes 100mm inside the walls. The shower recess must be waterproofed 100mm above the shower rose outlet. Also the bathtub needs to be waterproofed 100mm above the lip of the bath around and on the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, hence the all water will simply go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay inside cement screed for a floor.

Before a floor tiles can laid the floor must be smooth and fairly flat having a slight fall for the drainage outlet. To do this you must use sand and cement mix and it is best to put in a waterproofing agent into this too. With a level, set a floor level with the doorway. Use the top aluminum angle because finished floor level and measure around the thickness of the tile plus 10mm for that glue. Mark about the lavatory using a level and then screed with your sand and cement mix which has a 1 to 3 degree fall for the top in the drain outlet. Take your time and obtain it right with all the finished level as smooth as possible. When the sand cement mix has set but is not dry (you are able to walk into it but you it is a little soft) rub it over having a house brick. This will remove each of the small highs and lows and appearance which has a level as you go. Let the restroom floor fully dry and then you needs to have an excellent surface to tile onto. Tip: the more work you put into a floor screed the easier your tiling will likely be.
NoDoor Walk in Shower Ideas and Facts You Must Know Traba Homes
100 Small Bathroom Designs  Ideas  Hative

Step five: Tile floor and walls
Lay your tiles on the bottom first then grout. Then lay your wall tiles making sure actually level as you lay. Once the toilet tiles have been cut and laid, grout all your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your new bathroom vanity making certain it is level and sealed around the top with silicone and also seal around the tub. Tip: make sure they have been in the right place prior to deciding to drill in your tiles.
The domain name snoofo.com is for sale in 2019 bathrooms Bathroom design small, Small
NoDoor Walk in Shower Ideas and Facts You Must Know  Traba Homes

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making sure things are all fitted correctly knowning that there won't be any leaks within your plumbing. - Enjoy your bathroom.