35 Best Backyard Pool Ideas

Best Backyard Design Ideas 35 Best Backyard Pool Ideas

Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms inside your home and they're also certainly the most expensive for renovate. Bathroom renovation is often a job that, if done well, can add value to your home along with a great space packed with design and light.
35 Best Backyard Pool Ideas

Bathroom design
Bathroom design may be the first part of a bath room renovation you need to get right. Just replacing the existing bathroom with similar design might not be enough. The key to great bathroom design is always to design it with all the individuals who are going to put it to use in mind. However be sure that your bathroom design also offers an overall use factor at the same time.

For example: If you were designing a bathroom for families you can still design the lavatory with quick access to the shower and bath. This would make certain that the structure would recieve treatment for people with limited mobility. This means if you sell your house or if you're renovating for profit your design has a wider market appeal. Great bathroom design also uses the room well, looking at the sunlight or window space, size of fittings, and drainage options. Draw out a strategy to scale and all the way down the sizes of the room. Mark the prevailing drainage points and then and water inlet points. Write down a wish set of the bathroom fittings to want and want with their sizes. Now marry both together and find out what fits. Note: Most bathroom drainage and water inlet points might be moved but this certainly does come at extra expense.
25+ Fabulous Small Backyard Designs with Swimming Pool  Architecture  Design

Bathroom remodel
If you have chosen to complete the project yourself or part of the job it really is time to hire a skip bin and retrieve the previous bathroom. If your house was developed pre 1980 you may have fibro bathroom wall linings with asbestos inside and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing available you won't ought to turn the river off for the complete house. Also you will have to jack hammer the bottom tiles up along with the sand and cement bed they are laid on.
Top 50 Best Backyard Pavilion Ideas  Covered Outdoor Structure Designs

Bathroom Renovation and construction
Bathrooms has to be construction properly from your start to be sure that the finished job is correct and true. This also ensures the design and appear of the toilet will have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct the fall of the floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Modern Backyard Landscape Home Design Ideas, Pictures, Remodel and Decor


Paint ceiling and final  one - Plumbing and electrical
At now many new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the modern plumbing so the plumbing fittings are correct when the tiling ends. For example: To centre a fitting in a shower recess you have to think about the thickness in the wall board, tile glue and tile so the fitting is going to be centred after the tiles are set up. The same refers to installing drainage pipes to get a toilet; the wall lining and tile thickness have to be taken into account hence the pipe is incorporated in the correct position if the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
Cozy Unique Backyard Furniture Ideas  Home Design

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout onto your new wall board using a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling do not install the cornice because this is best done after tiling. If you happen to be not tiling towards the ceiling just install the cornice following your wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now from the frame and install the tub. Ensure the bathtub is installed correctly allowing for the thickness from the tiles and  sure to check all linings and pipes prior to deciding to continue with your bathrooms renovation.

25+ Fabulous Small Backyard Designs with Swimming Pool Architecture Design
35 Best Backyard Pool Ideas

Step three - Waterproof your bathrooms
Waterproof your bathrooms floor, shower recess, and around the bathtub. When waterproofing the floor be sure that the waterproofing comes 100mm the walls. The shower recess will have to be waterproofed 100mm across the shower rose outlet. Also the bathtub needs to be waterproofed 100mm above the lip of the bath right around and for the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water will only go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most significant.
Step four - Lay within the cement screed for the floor.

Before the bottom tiles can laid the bottom have to be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you should use sand and cement mix and it's also far better to add a waterproofing agent into this too. With a level, set the ground level at the doorway. Use the top aluminum angle because the finished floor level and measure around the thickness with the tile plus 10mm for that glue. Mark right around the bathroom which has a level and after that screed with your sand and cement mix having a 1 to 3 degree fall towards the top from the drain outlet. Take your time and get it right while using finished level as smooth as possible. When the sand cement mix has set but is just not dry (you'll be able to walk on it however you it's still somewhat soft) rub it over which has a house brick. This will remove all of the small highs and lows and look using a level when you go. Let the lavatory floor fully dry and then you really should have an incredible surface to tile onto. Tip: the harder work you add into the ground screed the more your tiling will likely be.
Top 50 Best Backyard Pavilion Ideas Covered Outdoor Structure Designs
25+ Fabulous Small Backyard Designs with Swimming Pool  Architecture  Design

Step five: Tile floor and walls
Lay your tiles on the floor first and after that grout. Then lay your wall tiles making certain that they are level as you lay. Once the restroom tiles happen to be cut and laid, grout all your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your bathroom vanity making certain it's level and sealed round the top with silicone and in addition seal around the bath. Tip: make sure they will be in the right place when you drill into the tiles.
Modern Backyard Landscape Home Design Ideas, Pictures, Remodel and Decor
Top 50 Best Backyard Pavilion Ideas  Covered Outdoor Structure Designs

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring things are all fitted correctly understanding that there isn't any leaks with your plumbing. - Enjoy your brand-new bathroom.

Comments