Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms in the house plus they are also the most costly to renovate. Bathroom renovation is really a job that, if done well, may add value to some home plus a great space brimming with design and lightweight.
3 Bedroom Apartment/House Plans

Bathroom design
Bathroom design will be the first division of your bathrooms renovation you need right. Just replacing the existing bathroom with the same design may not be enough. The key to great bathroom design is to design it with all the people that will use it in mind. However make certain that a bath room design boasts an over-all use factor as well.

For example: If you were designing your bathrooms for families you can still design the bathroom with easy access on the shower and bath. This would ensure that the structure would work for those who have limited mobility. This means if you opt to sell your home or if you happen to be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the area well, looking at the lighting or window space, size of fittings, and drainage options. Draw out a strategy to scale and all the way down the sizes of your room. Mark the current drainage points and after that and water inlet points. Write down a wish listing of the bathroom fittings to require and want using sizes. Now marry both the together and discover what fits. Note: Most bathroom drainage and water inlet points could be moved but this certainly does come at extra expense.
Middleton Stoney, Nr Bicester  OX25  Ref: 30242  Bicester

Bathroom remodel
If you've decided to accomplish the project yourself or part of the project it really is time to hire a skip bin and pull out the existing bathroom. If your house appeared pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing available you do not have to turn the lake off for the entire house. Also you should jack hammer a floor tiles up along with the sand and cement bed they are laid on.
Ranch Style House Plan  3 Beds 2.50 Baths 2096 Sq/Ft Plan 17174

Bathroom Renovation and construction
Bathrooms has to be construction properly through the start to make certain that the finished job is correct and true. This also ensures the look and appearance of the lavatory can have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct the fall of the ground with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
25 More 3 Bedroom 3D Floor Plans  Architecture  Design


Paint ceiling and final  one - Plumbing and electrical
At this point many new plumbing is installed for clean hot and cold water and drainage. Careful attention should be taken when positioning the newest plumbing so your plumbing fittings are correct if the tiling is fully gone. For example: To centre a fitting in the shower recess you need to think about the thickness with the wall board, tile glue and tile so the fitting will probably be centred after the tiles are in place. The same refers to installing drainage pipes for a toilet; the wall lining and tile thickness has to be taken into consideration so the pipe is incorporated in the correct position if the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them for the mains power.
3 Bedroom 285m2 [FLOOR PLAN ONLY] – HousePlansHQ

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling tend not to install the cornice because this is most effectively achieved after tiling. If you are not tiling on the ceiling go on and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding it's simple to form the frame and install the tub. Ensure the tub is installed correctly permitting the thickness of the tiles and  sure to check on all linings and pipes when you continue with your bathrooms renovation.

Middleton Stoney, Nr Bicester OX25 Ref: 30242 Bicester
3 Bedroom Apartment/House Plans

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the ground be sure that the waterproofing comes 100mm inside the walls. The shower recess must be waterproofed 100mm higher than the shower rose outlet. Also the bathtub ought to be waterproofed 100mm across the lip from the bath right around and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water will only decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most important.
Step four - Lay within the cement screed for a floor.

Before the floor tiles can laid the ground has to be smooth and fairly flat with a slight fall for the drainage outlet. To do this you have to use sand and cement mix and it's also best to give a waterproofing agent into this as well. With a level, set the ground level with the doorway. Use the top aluminum angle because the finished floor level and measure along the thickness with the tile plus 10mm for that glue. Mark right around the lavatory with a level and after that screed with your sand and cement mix using a 1 to 3 degree fall towards the top of the drain outlet. Take your time and obtain it right using the finished level as smooth as you can. When the sand cement mix has set but is just not dry (you'll be able to walk about it nevertheless, you will still be a lttle bit soft) rub it over with a house brick. This will remove every one of the small highs and lows and look using a level when you go. Let the lavatory floor fully dry then you should have a fantastic surface to tile onto. Tip: the more work you place into the bottom screed the simpler your tiling is going to be.
Ranch Style House Plan 3 Beds 2.50 Baths 2096 Sq/Ft Plan 17174
Middleton Stoney, Nr Bicester  OX25  Ref: 30242  Bicester

Step five: Tile floor and walls
Lay your tiles on the floor first then grout. Then lay your wall tiles ensuring that they are level when you lay. Once the restroom tiles are already cut and laid, grout all of your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your brand-new bathroom vanity ensuring it really is level and sealed throughout the top with silicone as well as seal around the bathtub. Tip: make sure they have been in the right place before you decide to drill into your tiles.
25 More 3 Bedroom 3D Floor Plans Architecture Design
Ranch Style House Plan  3 Beds 2.50 Baths 2096 Sq/Ft Plan 17174

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean making certain things are fitted correctly knowning that there isn't any leaks inside your plumbing. - Enjoy your brand-new bathroom.