25 More 3 Bedroom 3D Floor Plans

3 Bedroom Home Design Plans 25 More 3 Bedroom 3D Floor Plans 25 More 3 Bedroom 3D Floor Plans

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house and they are generally also certainly the most costly to renovate. Bathroom renovation is really a job that, if done well, can also add value to some home plus a great space packed with design and lightweight.
25 More 3 Bedroom 3D Floor Plans

Bathroom design
Bathroom design is the first division of your bathroom renovation you need right. Just replacing the prevailing bathroom with the same design might not be enough. The key to great bathroom design is to design it while using people that will certainly utilize it at heart. However make sure that your bathroom design boasts an over-all use factor also.

For example: If you were designing your bathrooms for families you can still design the lavatory with quick access to the shower and bath. This would make certain that the design would also work if you have limited mobility. This means if you decide to sell your house or if you might be renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, taking into account the light or window space, sized fittings, and drainage options. Draw out an idea to scale and down the sizes of the room. Mark the present drainage points and after that and water inlet points. Write down a wish set of the toilet fittings to need and wish using sizes. Now marry the 2 together and find out what fits. Note: Most bathroom drainage and water inlet points might be moved but this does come at extra expense.
3 Bedroom House Plans  Home Designs  Celebration Homes

Bathroom remodel
If you have chosen to perform the project yourself or part of the task it's time to employ a skip bin and retrieve the previous bathroom. If your house was made pre 1980 you may have fibro bathroom wall linings with asbestos inside it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you will not ought to turn the water off for the entire house. Also you should jack hammer the bottom tiles up and the sand and cement bed that they are laid on.
25 More 3 Bedroom 3D Floor Plans

Bathroom Renovation and construction
Bathrooms must be construction properly from the start to make sure that the finished job is correct and true. This also ensures the look and look of the bathroom can have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bathtub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct december a floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
12 examples of Minimalist 3 bedroom House floor plan 3D  YouTube


Paint ceiling and final  one - Plumbing and electrical
At this point many new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the brand new plumbing so the plumbing fittings are correct in the event the tiling is finished. For example: To centre a fitting inside a shower recess you need to take into consideration the thickness with the wall board, tile glue and tile therefore the fitting will likely be centred following the tiles are set up. The same relates to installing drainage pipes for the toilet; the wall lining and tile thickness has to be looked at therefore the pipe is within the correct position when the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them to the mains power.
3 Bedroom Apartment/House Plans

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board with a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you might be laying your tiles from floor to ceiling usually do not install the cornice because best done after tiling. If you might be not tiling on the ceiling proceed to install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath isn't freestanding anyone can form the frame and install the bathtub. Ensure the bath is installed correctly permitting the thickness in the tiles and  sure to check on all linings and pipes before you decide to continue with your bathrooms renovation.

3 Bedroom House Plans Home Designs Celebration Homes
25 More 3 Bedroom 3D Floor Plans

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the floor be sure that the waterproofing comes 100mm up the walls. The shower recess will have to be waterproofed 100mm above the shower rose outlet. Also the bathtub must be waterproofed 100mm across the lip from the bath about and towards the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, therefore the all water will only go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most important.
Step four - Lay within the cement screed for the ground.

Before the bottom tiles can laid the ground has to be smooth and fairly flat with a slight fall to the drainage outlet. To do this you must use sand and cement mix and it is far better to give a waterproofing agent into this as well. With a level, set a floor level at the doorway. Use the top aluminum angle because finished floor level and measure down the thickness in the tile plus 10mm for your glue. Mark around the restroom with a level after which screed inside your sand and cement mix which has a 1 to 3 degree fall on the top in the drain outlet. Take your time and obtain it right with all the finished level as smooth as you can. When the sand cement mix has set but is not dry (you can walk on it nevertheless, you will still be a lttle bit soft) rub it over which has a house brick. This will remove all of the small highs and lows and appearance which has a level because you go. Let the restroom floor fully dry after which you must have a fantastic surface to tile onto. Tip: the greater work you put into a floor screed the simpler your tiling will likely be.
25 More 3 Bedroom 3D Floor Plans
3 Bedroom House Plans  Home Designs  Celebration Homes

Step five: Tile floor and walls
Lay your tiles on the ground first and after that grout. Then lay your wall tiles making sure that they're level because you lay. Once the lavatory tiles are already cut and laid, grout all your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your brand-new bathroom vanity making certain it can be level and sealed round the top with silicone plus seal around the tub. Tip: make sure they have been in the right place before you drill into your tiles.
12 examples of Minimalist 3 bedroom House floor plan 3D YouTube
25 More 3 Bedroom 3D Floor Plans

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that things are fitted correctly knowning that there are no leaks within your plumbing. - Enjoy your new bathroom.

Comments