20 Small Backyard Garden Design Ideas YouTube

Small Backyard Landscaping With Pool Nisartmacka 20 Small Backyard Garden Design Ideas YouTube

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house and they're also one the most costly to renovate. Bathroom renovation is a job that, if done well, will add value to some home along with a great space brimming with design and light.
20 Small Backyard Garden Design Ideas  YouTube

Bathroom design
Bathroom design could be the first division of your bathroom renovation you ought to get right. Just replacing the current bathroom with the same design might not be enough. The key to great bathroom design is usually to design it with all the people that are going to utilize it in your mind. However be sure that your bathrooms design even offers a broad use factor too.

For example: If you were designing your bathrooms for families you could still design the bathroom with comfortable access towards the shower and bath. This would be sure that the look would recieve treatment for those who have limited mobility. This means if you opt to sell your own home or if you are renovating for profit your design includes a wider market appeal. Great bathroom design also uses the room well, considering the sunlight or window space, size of fittings, and drainage options. Draw out a strategy to scale and right down the sizes of your respective room. Mark the current drainage points and then and water inlet points. Write down a wish set of the restroom fittings to want and wish using sizes. Now marry both the together and see what fits. Note: Most bathroom drainage and water inlet points may be moved but this may come at expense.
30 Amazing Pool Landscaping Ideas For Your Home  Carnahan

Bathroom remodel
If you have decided to do the job yourself or part of the job it can be time to employ a skip bin and take out the existing bathroom. If your house was developed pre 1980 you may have fibro bathroom wall linings with asbestos inside and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in position you will not must turn the water off for the whole house. Also you will have to jack hammer a floor tiles up as well as the sand and cement bed that they are laid on.
601 best images about Lets do Lap Pools on Pinterest

Bathroom Renovation and construction
Bathrooms has to be construction properly from your ground up to be sure that the finished job is correct and true. This also ensures the design and look of the lavatory could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof a floor and shower and bath recess.

Correct late the bottom with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
25+ best ideas about Fence around pool on Pinterest  Garden makeover, Pebble patio and Hanging


Paint ceiling and final  one - Plumbing and electrical
At this point new plumbing is installed for clean cold and hot water and drainage. Careful attention should be taken when positioning the brand new plumbing in order that the plumbing fittings are correct once the tiling ends. For example: To centre a fitting in a very shower recess you have to think about the thickness from the wall board, tile glue and tile so the fitting will be centred after the tiles are available. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness have to be considered hence the pipe is incorporated in the correct position once the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them towards the mains power.
23 Small Backyard Ideas How to Make Them Look Spacious and Cozy  Architecture  Design

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout onto your new wall board which has a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you happen to be laying your tiles from floor to ceiling do not install the cornice because best done after tiling. If you're not tiling on the ceiling proceed to install the cornice following the wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding it's simple to from the frame and install the bathtub. Ensure the bathtub is installed correctly allowing for the thickness with the tiles and  sure to evaluate all linings and pipes when you continue with a bath room renovation.

30 Amazing Pool Landscaping Ideas For Your Home Carnahan
20 Small Backyard Garden Design Ideas  YouTube

Step three - Waterproof your bathroom
Waterproof your bathrooms floor, shower recess, and around the bath. When waterproofing the floor make certain that the waterproofing comes 100mm up the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the tub needs to be waterproofed 100mm across the lip from the bath about and for the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water will only go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay in the cement screed for the ground.

Before a floor tiles can laid the bottom have to be smooth and fairly flat having a slight fall for the drainage outlet. To do this you must use sand and cement mix and it's also best to give a waterproofing agent into this also. With a level, set the bottom level with the doorway. Use the top aluminum angle since the finished floor level and measure on the thickness from the tile plus 10mm to the glue. Mark around the restroom using a level and after that screed with your sand and cement mix having a 1 to 3 degree fall on the top of the drain outlet. Take your time and obtain it right with all the finished level as smooth as you can. When the sand cement mix has set but is not dry (you'll be able to walk into it nevertheless, you it is a little soft) rub it over with a house brick. This will remove all of the small highs and lows and check using a level as you go. Let the toilet floor fully dry then you really should have a fantastic surface to tile onto. Tip: the more work you place into the floor screed the easier your tiling will probably be.
601 best images about Lets do Lap Pools on Pinterest
30 Amazing Pool Landscaping Ideas For Your Home  Carnahan

Step five: Tile floor and walls
Lay your tiles on the ground first and then grout. Then lay your wall tiles ensuring that that they're level as you lay. Once the bathroom tiles happen to be cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your brand-new bathroom vanity making certain it is level and sealed across the top with silicone plus seal around the bath. Tip: make sure they are in the right place before you decide to drill into your tiles.
25+ best ideas about Fence around pool on Pinterest Garden makeover, Pebble patio and Hanging
601 best images about Lets do Lap Pools on Pinterest

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring things are all fitted correctly knowning that there won't be any leaks inside your plumbing. - Enjoy a new bathroom.

Comments