15 Master Bedroom Interior Design Pooja Room and Rangoli Designs

Bedroom Windows Designs Modern Bedroom With Large Windows | Interior Design Ideas 15 Master Bedroom Interior Design Pooja Room and Rangoli Designs

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home and they are also the most costly to renovate. Bathroom renovation is really a job that, if done well, can also add value with a home along with a great space filled with design and light-weight.
15 Master Bedroom Interior Design  Pooja Room and Rangoli Designs

Bathroom design
Bathroom design may be the first part of your bathrooms renovation you should get right. Just replacing the existing bathroom with the same design might not be enough. The key to great bathroom design is to design it with all the folks that are likely to put it to use in mind. However make certain that a bath room design also offers an overall use factor also.

For example: If you were designing your bathroom for families you can still design the bathroom with comfortable access for the shower and bath. This would ensure that the look would work for people with limited mobility. This means if you opt to sell your property or if you might be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the space well, taking into account the lighting or window space, size fittings, and drainage options. Draw out an idea to scale and down the sizes of the room. Mark the prevailing drainage points then and water inlet points. Write down a wish set of the lavatory fittings to require and wish making use of their sizes. Now marry the 2 together to see what fits. Note: Most bathroom drainage and water inlet points may be moved but this will come at extra expense.
Interior Design Ideas By JDG  iDesignArch  Interior Design, Architecture  Interior Decorating

Bathroom remodel
If you've decided to accomplish the work yourself or part of the project it is time to engage a skip bin and retrieve the old bathroom. If your home is made pre 1980 you may have fibro bathroom wall linings with asbestos inside and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you'll not ought to turn the lake off for the entire house. Also you will have to jack hammer the floor tiles up as well as the sand and cement bed actually laid on.
Idée déco toilette moderne, classique, élégante

Bathroom Renovation and construction
Bathrooms has to be construction properly through the ground up to make certain that the finished job is correct and true. This also ensures the design and search of the restroom could have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct december the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Noroof Architects’ BedStuy porcHouse reimagines the classic American front porch  6sqft


Paint ceiling and final  one - Plumbing and electrical
At now new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the modern plumbing in order that the plumbing fittings are correct if the tiling is completed. For example: To centre a fitting in a shower recess you must consider the thickness from the wall board, tile glue and tile so the fitting is going to be centred after the tiles are set up. The same relates to installing drainage pipes to get a toilet; the wall lining and tile thickness must be taken into consideration therefore the pipe influences correct position if the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
Modern Living Room Interior Design Ideas

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on to your new wall board which has a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you happen to be laying your tiles from floor to ceiling do not install the cornice because best done after tiling. If you're not tiling for the ceiling proceed to install the cornice following your wallboard and ceiling lining happen to be installed. Also if your bath is just not freestanding anyone can from the frame and install the tub. Ensure the tub is installed correctly allowing for the thickness from the tiles and  sure to evaluate all linings and pipes when you continue with your bathroom renovation.

Interior Design Ideas By JDG iDesignArch Interior Design, Architecture Interior Decorating
15 Master Bedroom Interior Design  Pooja Room and Rangoli Designs

Step three - Waterproof your bathrooms
Waterproof your bathrooms floor, shower recess, and around the bathtub. When waterproofing a floor make certain that the waterproofing comes 100mm in the walls. The shower recess should be waterproofed 100mm over the shower rose outlet. Also the bathtub ought to be waterproofed 100mm higher than the lip with the bath right around and towards the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water is only going to go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most significant.
Step four - Lay in the cement screed for the ground.

Before the floor tiles can laid the ground has to be smooth and fairly flat with a slight fall towards the drainage outlet. To do this you must use sand and cement mix in fact it is far better to put in a waterproofing agent into this as well. With a level, set the ground level with the doorway. Use the top aluminum angle as the finished floor level and measure on the thickness from the tile plus 10mm for your glue. Mark around the bathroom which has a level after which screed with your sand and cement mix with a 1 to 3 degree fall towards the top in the drain outlet. Take your time and obtain it right using the finished level as smooth as is possible. When the sand cement mix has set but isn't dry (you can walk onto it however you will still be a lttle bit soft) rub it over using a house brick. This will remove all the small highs and lows and appearance having a level while you go. Let the lavatory floor fully dry and then you must have an excellent surface to tile onto. Tip: the harder work you set into the ground screed the easier your tiling will likely be.
Idée déco toilette moderne, classique, élégante
Interior Design Ideas By JDG  iDesignArch  Interior Design, Architecture  Interior Decorating

Step five: Tile floor and walls
Lay your tiles on the floor first then grout. Then lay your wall tiles making certain they are level as you lay. Once the toilet tiles happen to be cut and laid, grout all of your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit a new bathroom vanity making sure it is level and sealed across the top with silicone as well as seal around the tub. Tip: make sure they are in the right place when you drill to your tiles.
Noroof Architects’ BedStuy porcHouse reimagines the classic American front porch 6sqft
Idée déco toilette moderne, classique, élégante

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean making certain it is all totally fitted correctly and that there isn't any leaks with your plumbing. - Enjoy your new bathroom.